How to Select the Correct Mooring Bollard Capacity

Writer: ESC Group
ESC Group
7 minutes ago
6 min read

Selecting the correct mooring bollard capacity is a critical part of designing a safe and reliable berth. A bollard must withstand the forces transferred through a vessel’s mooring lines while accounting for vessel characteristics, environmental loads, line configuration, operating conditions, and the supporting structure.


Marine mooring bollards on a concrete berth for vessel mooring

Simply choosing a bollard according to vessel size or deadweight tonnage is not enough. Mooring loads are influenced by wind, current, waves, tides, vessel geometry, line angles, and how loads are distributed across the mooring arrangement.


For ports, terminals, jetties, wharves, and marine facilities, the objective is therefore not to select the largest available bollard. It is to determine the appropriate rated capacity for the actual design loads and mooring conditions.



What Does Mooring Bollard Capacity Mean?



The capacity should not be considered in isolation. The complete load path includes:


Mooring Line → Bollard → Anchor Bolts → Concrete/Foundation → Quay or Berthing Structure


Every component in this load path must be capable of safely transferring the design forces.


This is particularly important because bollards are safety-critical components of marine infrastructure. PIANC guidance similarly treats the bollard or hook, its fixings, and its foundation as an integrated system rather than independent components.



1. Start with the Design Vessel

The first step is to establish the characteristics of the vessels expected to use the berth.


Important parameters may include:

  • Vessel type

  • Displacement

  • Length overall (LOA)

  • Beam

  • Draft and variations in draft

  • Freeboard

  • Above-water projected area

  • Underwater projected area

  • Mooring equipment and arrangement


Deadweight tonnage can provide an indication of vessel scale, but it should not automatically be treated as the required bollard capacity. The actual loading depends on the complete vessel, environmental, and mooring arrangement.


This becomes particularly important for facilities serving multiple vessel classes. Bollards should be selected for the governing design condition, not simply the vessel most frequently calling at the berth.


Marine mooring bollard securing a vessel with mooring lines at a berth

2. Evaluate Wind, Current, Waves and Tidal Conditions

A moored vessel remains exposed to environmental forces even after berthing.


The main loads typically considered include:


Wind

Wind acting on a vessel’s exposed hull and superstructure can generate significant longitudinal and transverse forces. For preliminary understanding, wind force may be represented by the simplified relationship:


F = ½ × ρ × C × A × V²


where:

  • F = wind force

  • ρ = air density

  • C = applicable wind force or drag coefficient

  • A = projected area exposed to the wind

  • V = wind velocity


Because force varies with the square of wind velocity, higher wind speeds can substantially increase the loads that must be resisted by the vessel’s mooring system.


For final bollard selection, however, wind loading should be determined using the applicable marine design standard, vessel characteristics, wind direction, site conditions, and project-specific mooring analysis.


Current

Current acts primarily against the vessel's submerged area. Vessel draft, current direction, berth configuration, water depth and hull geometry can all influence the resulting load.


Waves and Swell

At exposed berths, waves and long-period swell can produce vessel motions and varying line tensions that require more detailed analysis.


Tides and Water-Level Changes

Changing water levels alter the vertical angle and geometry of mooring lines as the vessel rises and falls relative to the berth.


ESC Marine Systems identifies wind and current forces, swell, waves, tidal forces, vessel draft changes, line characteristics and line angles among the important considerations when selecting a marine bollard.


The total environmental force acting on a vessel is not necessarily the load applied to a single bollard.


3. Understand the Mooring Arrangement

The vessel is secured through a system of:

  • Head lines

  • Stern lines

  • Breast lines

  • Spring lines


Their orientation determines how effectively they resist longitudinal and transverse vessel movement.


The designer should therefore evaluate:

  • Number of active mooring lines

  • Number of lines attached to each bollard

  • Line spacing

  • Horizontal and vertical line angles

  • Vessel fairlead locations

  • Bollard positions

  • Mooring line properties

  • Expected line pretension

  • Load sharing between lines and bollards


Poor geometry can result in uneven load distribution and place significantly higher demand on individual mooring points.



4. Check Mooring Line Loads and Angles

The angle at which a mooring line approaches a bollard matters.


A bollard rated for a particular load is designed around defined loading conditions. High horizontal or vertical line angles can change the force components acting on the bollard, anchoring arrangement and supporting structure.







5. Determine the Required Rated Capacity

Once the environmental forces and mooring arrangement have been established, loads can be distributed through the mooring system to determine the governing demand at individual bollards.


The selected capacity should satisfy the applicable design criteria and project standard while considering:

  • Governing line load

  • Number of lines sharing the bollard

  • Horizontal and vertical load components

  • Applicable load or safety factors

  • Extreme operating conditions

  • Future vessel requirements where specified


For example, if engineering analysis establishes that a particular mooring point requires a capacity greater than a nominal 70-tonne bollard can safely provide under the applicable design criteria, the designer would move to the next suitable rated capacity and verify the complete bollard and anchoring system.


The final rating should always come from the project-specific mooring analysis and applicable design standard, rather than a simple vessel-tonnage lookup table.


Red marine mooring bollards installed along a concrete berth with rubber fenders

6. Verify the Foundation and Anchor Bolts

Selecting a correctly rated bollard does not automatically produce a correctly designed mooring point.


The supporting structure must also resist the forces generated by the bollard.


Checks may include:

  • Anchor bolt tension

  • Anchor bolt shear

  • Concrete breakout

  • Pull-out resistance

  • Concrete edge distances

  • Reinforcement

  • Base-plate bearing

  • Local structural capacity

  • Global quay, dolphin or deck capacity


This is particularly important when replacing an existing bollard with a higher-capacity unit. Installing a heavier bollard on the same foundation does not mean the mooring point automatically gains the higher capacity.


The supporting structure must be verified for the new loads.



7. Consider Material and Corrosion Protection



Material specification, coating system, inspection access and maintenance requirements should therefore form part of the bollard selection process rather than being considered only after capacity has been established.



8. Design to the Applicable Marine Standard



The applicable requirements should be established early in the project because they can influence load cases, capacity, arrangement, material selection, anchoring and testing.


Mooring bollard load diagram showing line tension, line angle, and horizontal and vertical force components


Mooring Bollard Capacity Range

ESC Marine Systems provides bollard configurations across a broad capacity range. Its published product information lists ratings extending from smaller 5-tonne cleat bollards through to bollards rated up to 300 tonnes, depending on configuration.


Available types include:


This range allows the bollard configuration to be matched to the required capacity, line geometry and operating conditions instead of relying on a one-size-fits-all solution.


Marine mooring bollard and mooring lines securing a cargo vessel at a port berth


Information to Provide When Requesting a Mooring Bollard

For preliminary bollard selection, providing good project information can significantly improve the quality of the recommendation.


Where available, include:


Vessel Information

  • Vessel type and size

  • Displacement or DWT

  • LOA and beam

  • Maximum and minimum draft


Mooring Information

  • Mooring arrangement or plan

  • Number and type of mooring lines

  • Line MBL

  • Expected line angles

  • Required bollard capacity, if already calculated


Environmental Information

  • Design wind speed

  • Current velocity

  • Wave or swell conditions

  • Tidal range


Berth Information

  • Quay, jetty or dolphin configuration

  • Proposed bollard spacing

  • Existing foundation details

  • Applicable design standard




Final Considerations


ESC Marine Systems mooring bollards catalogue featuring marine bollard installations

Selecting the correct mooring bollard capacity requires more than matching a bollard rating to vessel tonnage.


A reliable design considers the complete system:


Design Vessel → Environmental Loads → Mooring Arrangement → Line Forces → Bollard Capacity → Anchoring → Supporting Structure


When these factors are evaluated together, engineers can establish a mooring solution that is both safe and practical without unnecessarily oversizing the equipment. 



Planning a new berth or reviewing an existing mooring system? 

Visit ESC Marine Systems to explore mooring bollard solutions and discuss your project requirements













 
 

ESC Group

​

Acclime Offices
17/F United Centre, 
95 Queensway  Admiralty
Hong Kong


 

  • ESC Group Linkedin
  • ESC Group Facebook
  • ESC Group Twitter
  • ESC Group Youtube
  • ESC Group Instagram
  • ESC Group Pinterest
APP STORE.png
google play_edited.png

© 2026 ESC Group.

bottom of page